Zhongshan, Guangdong, China takes the lead in "curing" pavement diseases

2020年07月29日

The reporter learned that in the past, in the road repair and maintenance, for the road surface with potholes, net cracks, rutting, damage, etc., you must first contact the asphalt processing station to purchase new materials for repair. Such construction operations not only take a long time, but also increase the cost of waste material disposal and the cost of purchasing and transporting new materials. In addition, in cold weather with rain and snow, cold patch asphalt can only be used to repair, but in this case, potholes will easily appear again after the road is crushed by vehicles, which wastes manpower and material resources and affects the normal travel of citizens.


Contact Us

Copyright © 2016 - 2021 Zhongshan EROMEI Road Maintenance Technology Co.,Ltd